根据GB 2587-2009《用能设备能量平衡通则》、GB/T2589-2020 《综合能耗计算通则》,对烧结工序单位产品综合能耗进行统计,计算。经对 2020 年 10 月至 2021 年 3 月烧结工序能源消耗、合格烧结矿产量的统计计算,得出评估结论: 统计期 2#烧结工序能耗为 40.39kgce/t 烧。
According to GB 2587-2009 general rules for energy balance of energy consuming equipment and GB / t2589-2020 general rules for calculation of comprehensive energy consumption, the comprehensive energy consumption per unit product in sintering process is counted and calculated. Based on the statistical calculation of the energy consumption of sintering process and the output of qualified sinter from October 2020 to March 2021, it is concluded that the energy consumption of 2# sintering process in the statistical period is 40.39kgce/t.