“第三代示范机组闪蒸换热运行数据”项目地点为首钢京唐3#高炉冲渣水预热回收热源站内,数据采集方式为通过智能仪器、仪表采集实时数据,在上位机软件上汇总生成数据报表并记录保存,数据采集时间为2020-12-17至2021-03-08,数据采集期间设备、仪器仪表运行状态良好,数据采集及记录稳定准确;
The project "Flash Heat Exchange Operation Data of the Third Generation Demonstration Unit" is located in the heat source station of JingTang No. 3 Blast Furnace of Shougang. The data collection method is to collect real-time data through intelligent instruments and instruments, collect and generate data statements on the upper computer software, and record and save the data collection time from 2020-12-17 to 2021-03-08. During data collection, equipment, instruments and meters are in good running condition, and data collection and recording are stable and accurate;