本发明公开一种铁包管控方法及装置,所述方法包括:接收运载空包的车架的第一插电信号,所述第一插电信息表明所述空包位于预设接铁位置;获取液位计上的铁包的标志位;根据所述标志位,对所述空包的包型进行验证;当所述空包的包型验证通过,对所述空包执行开盖操作,以进行接铁时,则记录对应的第一开盖时间;当所述空包完成接铁,成为重包,对所述重包执行关盖操作时,则记录对应的第一关盖时间。本发明可避免因包型不一致导致接铁过程中的溢铁,且可为铁水调度的实现提供信息支撑。
The invention discloses a control method and device for iron bale. The method comprises receiving the first electrical signal of the frame carrying empty bale, and the first electrical information indicates that the empty bale is located at a preset iron connection position; Obtain the symbol position of the iron package on the level gauge; According to the flag bit, the package type of the empty package is verified; When the package type verification of the empty package is passed, the empty package is performed to open the cover operation for iron connection, then the corresponding first open cover time is recorded; When the empty packet completes the iron connection and becomes a re-packet, and the re-packet is closed, the corresponding first closing time is recorded. The invention can avoid iron overflow in the process of iron connection due to inconsistent package type and provide information support for the realization of hot iron scheduling.